The company has a modern manufacturing plant at Udyog
Vihar, Gurgaon, about 10 KM from New Delhi Airport.
The plant is fully equipped with the latest machines
as well as testing facilities to match the best in technology
prevailing in the world.
Based on a 18,000 sq. meters site, built
up area of around 4,000 sq.meters. A steel yard and
painting & sand blasting rooms have been constructed
at the rear of the plant.
The machinery and equipment at the plant
include a hydraulic CNC 750 tonnes Press brake and a
variety of metal cutting, forming and welding machines.
The installed production capacity is rated at 2,000
metric tonnes per annum.
In addition, 600 sq. meters of office area have been
constructed which includes 225 sq.metres of design office
space.
CAD facility includes 14 workstations equipped with
Auto CAD 2000, two stations with SOLID EDGE and two
with mechanical Desktop softwares. This facility also
has a fully equipped Chemical analysis laboratory for
testing of raw material.
The working environment at the plant is pleasant and
benefits from a large garden and trees planted along
its perimeter. Despite having quickly built up a reputation
as a professionally run and quality driven company the
team at BHP went a step further and in 1997 were one
of the first Indian companies to secure ISO 9001 certification.
We are committed to quality and have put in place processes
to continuously improve ourselves and to ensure certification
at the highest current quality level.
|